Project Overview
O’Donnell & Naccarato provided structural engineering services for the phased restoration of the parking garage located at RWJ University Hospital in New Brunswick NJ. The garage is a 4-story, 225,000 SF, conventional reinforced concrete structure. The garage required vertical, overhead, partial and full-depth repairs at isolated locations on each level of the structure. Acting as both the self-park and valet garage for the hospital, the coordination between O&N, the onsite parking staff and the restoration contractor was critical throughout all phases of the repair. A traffic bearing membrane system was applied over the slabs once repairs were complete to extend the service life of the garage and minimize future deterioration.
SECTOR
Restoration
SERVICE
Garage Restoration
KEY FEATURE
400 Cars
Robert Wood Johnson Garage
Garage Condition Assessment & Restoration
-
LocationNew Brunswick, NJ
-
OwnerRobert Wood Johnson University Hospital
-
ContractorSchnell Contractors
-
Size225,000 SF