Skip to main content
Bala Cynwyd, PA

111 Presidential Boulevard Garage

Project Overview

O’Donnell & Naccarato provided structural engineering services for the phased restoration of the 2-story parking garage following a condition assessment of the existing 1,095,700 SF, above-and below-grade structure. O’Donnell & Naccarato identified deteriorated areas and developed detailed restoration drawings and specifications. The restoration consisted of precast concrete plank replacement, beam, horizontal, column, and vertical concrete repairs, expansion joint replacement, control joint replacement, and the installation of epoxy waterproof on the new top-level concrete planks.

SECTOR
Restoration
SERVICE
Garage Restoration

111 Presidential Boulevard Garage

Garage Restoration
  • Location
    Bala Cynwyd, PA
  • Owner
    Cushman and Wakefield
  • Contractor
    Palmer Waterproofing
  • Size
    1,095,700 SF
structural engineer / garage restoration / Presidential Blvd/ O’Donnell & Naccarato structural engineer / garage restoration / Presidential Blvd/ O’Donnell & Naccarato

    Would you like to know more about this project?