Skip to main content
York, PA

UPMC Memorial Replacement Hospital

Project Overview

O’Donnell & Naccarato provided structural design of the 5-story, 250,000 SF replacement hospital, as well as a standalone, 9,000 SF central utility plant. The 110-bed facility is a full-service hospital including emergency, critical care, diagnostic imaging, general surgery, maternity, pharmacy, and general inpatient care services. The condensed design schedule included early structural release packages, which were completed within 11 weeks following schematic design.

SECTOR
Healthcare
SERVICE
Structural Engineering
KEY FEATURE
110 Patient Beds

UPMC Memorial Replacement Hospital

Replacement Hospital
  • Location
    York, PA
  • Owner
    UPMC Health
  • Architect
    Stantec
  • Size
    250,000 SF

    Would you like to know more about this project?